Thermal Power Plants

2022
Additional electrical works- Commissioning services for the project: Construction and commissioning of a Combined Cycle Power Plant (CCGT Power Plant) 860 MW at Ag. Nikolaos of Viotia- IPP-II

MYTILINEOS GROUP / METKA

2022
Construction of complete electrical works (electrical power, weak currents and High Voltag curents (400kV), Instrumentation for mesuring and automation) of a Combined Cycle Power Plant (CCGT Power Plant) 860 MW at Ag. Nikolaos of Viotia - IPP-II

MYTILINEOS GROUP / METKA

2016
Complete electrical and Instruments installation, testing and commissioning of all equipment regarding DeNOx System for Units I & II in Ag. Dimitrios S.E.S.

MYTILINEOS GROUP / METKA

2013
Rehabilitation of the wiring and the electrical equipment after fire at the M.E.S. Meleti - Florina

PPC

2011
Complete Construction of Gas Turbine, Lube & Seal Oil System of Combined Cycle on one axle Thermoelectric Power Station of installed capacity 436.6 MW at the Power facilities of Korinthos Power at in Agioi Theodoroi

KORINTHOS POWER / METKA

2010
Complete Construction of Auxiliary Boiler and Air Cooled Heat Exchanger of Combined Cycle on one axle Thermoelectric Power Station of installed capacity 436.6 MW at the Power facilities of Korinthos Power- Agioi Theodoroi

KORINTHOS POWER / METKA

1999
Desing and installation of a system for efficientcy measuring and calculation at Amyntaion S.E.S.

PROMETHEUS GAS

1999
Electromichanical Erection of engine - shed's equipment, Turbine building at Meliti S.E.S.

1998
Instruments and Piping Installations at S.E.S. at Lavrio

P.P.C.

1998
Maintenance and Cleaning of the Steam Power Stations of PPC (5 year Contract)

P.P.C.

1998
Electromechanical Erection Works at Combined Cycle Power plant at Lavrion S.E.S.

P.P.C

1998
Electrical Erection of Combined Cycle Power plant of Lavrion S.E.S.

ALSTHOM / METKA

1996
Electrical & I & C Installation of S.E.S. at Ag. Dimitrios Unit V

ANSALNDO (P.P.C.)

1995
Retrofit of T.P.S. Keratsini unit No.9 for the full scope of Electrical, Instrumentation and dismanting works including the Gas Pressure Reducing Station

TECHNOPROMEXPORT (P.P.C.)

1995
Annual Maintenance/cleaning at Ag. Georgiou S.E.S.

P.P.C.

1995
Electrical and I&C installation of PPC's Hydroelectrical Power Station at Thissauros CEGELEC

(ΔΕΗ)

1994
Replacement of L/P Preheaters at Kardia S.E.S. - Unit II

P.P.C

1994
Electromechanical Erection of Tank Truck Loading Station including Revamping in consortium with CEGELEC

ASPATE SA – CEGELEC (EKO Thessaloniki)

1993
Erection of electrical & mechanical equipment at Lavrio C.P.D.- Plant and Refurbishement of Main power Transformer at Lavrio C.P.D.- Plant

BABCOCK (P.P.C.)

1993
Modification works of Steam Turbine, Heat exchangers and pipework for Districkt Heating application at Ptolemais.

A.B.B. (P.P.C.)

1993
Design, construction and commissining of the new Tank Truck Loading Station, including Revamping, Civil and Electromehanical Works

ASPATE SA – CEGELEC (EKO Thessaloniki)

1992
Mechanical Erection of Combined Cycle Power Plant at Chania (Gas turbnine - Phase I)

A.B.B. – BIOKAT (P.P.C.)

1992
Mechanical Equipment installation of Steam Turbine Plant at Chania.

BABCOCK (P.P.C.)

1991
Condenser Cleaning System installation at Megalopoli S.E.S. Units I/II

KOLLER (P.P.C.)

1991
Construction and installation of metaLlic covering of belt conveyors, Megalopolis

P.P.C.

1989
Erection of generators and associated electrical equipment of the P.P.C. Diesel Power Plant at Rhodes. 2 Units, 12 MW each

A.B.B. (P.P.C.)

1988
Erection of generators and associated electrical equipment of the P.P.C. Diesel Power Plant at Linoperamata- Heraklion. 2 Units, 12 MW each

A.B.B.

1986
Dismanting transportation and erection works of 360 MVA step - up transformer at Kardia S.E.S. - Unit IV

CGE ALSTHOM (P.P.C.)

1986
Erection of electrical equipment of CONDENSER at Ag. Dimitrios S.E.S. - Units III/IV

MANNESMAN (P.P.C.)

1986
Partial commissioning at Aminteon S.E.S.

ALSTHOM – ATLANTIQUE (PPC)

1986
Dismanting, transportation and erection works of 360 MVA step-up transformer. Kardia S.E.S. Unit IV

ALSTHOM – ATLANTIQUE (P.P.C.)

1986
Electrical equipment erection of the Loading Vehicle of South Mine

METKA (P.P.C.)

1986
Installation of electrical systems for Amynteon Mines depositors

METKA (P.P.C.)

1984
Erection of electrical equipment for the electrostatic precipitators and lignite handling system at Ag. Dimitrios S.E.S. - Units III-IV

METKA (P.P.C.)

1984
Erection of electrical equipment of the lignite feeding system at Ag. Dimitrios S.E.S. (4 x 300 MW)

ALSTHOM (P.P.C.)

1984
Lighting installation of crusher house at Ag. Dimitrios S.E.S.

ALSTHOM (P.P.C.)

1983
Erection of electrical equipment of the electrostatic precipitators at Ag. Dimitrios S.E.S. - Units I & II. 2, Erection of electrical equipment of lignite handling system Ag. Dimitrios S.E.S. - Units I & II. 3, Lighting installation Ag. Dimitrios S.E.S. - Units I & II.

METKA (P.P.C.)

1983
Electrical installation of crusher house feeding conveyors at Ag. Dimitrios S.E.S.

METKA (P.P.C.)

1983
Erection of electrical equipment of the crusher house at Ag. Dimitrios S.E.S. (4 x 300 MW)

ALSTHOM (P.P.C.)

1979
Installation of 6 KV switchgear, 380V panels, earthings, cable trays, lighting and telecommunications systems at Kardia S.E.S. - Units III -IV

BBC – TEXNOM (P.P.C.)